Ribbon Cutting at Eleanor Slater Hospital's Regan Building

  • Architecture
  • Sep 14 2026

On September 3, 2026, NEMD Architects, TOCCI, and STV, along with the State of Rhode Island, celebrated the ribbon-cutting at Eleanor Slater Hospital's Regan Building, a significant step towards improving behavioral healthcare in the state.

This project encompassed the Health Upgrades for the State of Rhode Island
renovating six floors of Eleanor Slater’s Regan Building, creating over 60,000 sf of Behavioral Health space. These enhancements are designed to create a safe and supportive environment. The project included secure lockdown psychiatric units, group therapy, consultation rooms, and patient beds. Specialty impact windows, anti-barricade doors, and advanced security systems will ensure a safe environment.

"Our collective efforts have resulted in a renewed healthcare space that not only meets the highest standards but also contributes significantly to the well-being of the community it serves.” Mehdi Khosrovani, President, NEMD Architects.

Leaders unveil newly renovated Regan Building of Eleanor Slater Hospital

 photo L-R: Frank Wierszchalek-DCAMM; Tim Mackay-STV; Jim Fratto-STV; Vincent Salines-STV; Wayne Arruda-NEMD Architects, Loren Witzel-NEMD Architects; Imran Momin-STV